Planned lane closures on IH 30 for this week:
Monday, May 5th thru Saturday, May 10th:
1. John King East to West U-turn closure. Daytime. 9A-3P. Bridge activities at John King.
2. John King West to East U-turn closure. Daytime. 9A-3P. Bridge activities at John King.
3. 30 Eastbound Left Lane from FM 548 to FM 2642. Overnight. 9P-5A. Bridge activities at FM 35 and Sabine Creek.
4. 30 Westbound Left Lane from FM 2642 to FM 548. Overnight. 9P-5A. Bridge activities at FM 35 and Sabine Creek.
5. FM 548 NB/SB. Flagging Operation. Daytime. 9A-3P. Drainage work and bridge activities at Pond Branch.
6. 30 Westbound Left Lane from FM 551 to FM 3549. Overnight. 9P-5A. Roadway excavation activities in the median area.
7. 30 Westbound Frontage Road. Flagging Operation. From Fate Main PL to FM 551. Daytime. 9A-3P. Embankment activities and placing Riprap/Curb at the ramp before FM 551 Westbound Frontage Road.
Wednesday, May 8th thru Saturday, May 10th:
1. 30 Eastbound Right Lane from SH 205 to John King. Overnight. 9P-5A. Install CSB.
Friday, May 9th thru Saturday, May 10th:
1. 30 Westbound. Alternating Lanes. Erby Campbell to FM 551. Overnight. 9P-5A. Relocate CSB/Temp Pave Markings installations
o Ramp Closures (as needed): Exit 75 to Westbound Frontage Road; Exit 73 to FM 551.
2. 30 Eastbound Left Lane at FM 3549. Overnight. 9P-Noon. Contractor will be conducting bridge work activities at FM 3549.
Contractor crews will work with EMS, fire, and police to allow access through the closure should emergencies occur.